Cases
How manufacturers use EVAjig
Real projects, from provisioning IoT devices to simulating batteries and testing many boards in parallel. Each case describes the challenge, our solution and the results.

provisioning IOT devices
This case covers an IOT device that has to be secured and known by the backend servers. The long duration of the test sequence is mitigated by parallelization.
10000+
tests
1+ years
duration
Read more

simulating a LiPo battery
In this case a LiPo battery is simulated by the EVAjig to test whether the device correctly charges the battery when it is provided with USB power and runs from battery power if there is no USB power.
100+
tests
1 month
duration
Read more

custom feature: DALI interface
A product required that the EVAjig implements DALI (Digital Addressable Lighting Interface); an interface designed specifically for controlling lighting systems.
500+
tests
1+ years
duration
Read more

high throughput individual testing
This case covers a product made in large quantities that
10000+
tests
duration
Read more

side approach mechanism
This case covers testing of a horizontal connector by a side approach mechanism with low force .
1500+
tests
duration
Read more